Assume one of the financial investors in the Leadenhall Building is worried about potential risks in the project.

Assume one of the financial investors in the Leadenhall Building is worried about potential risks in the project.

Your Topic: RISK

Assignment Details: Assume one of the financial investors in the Leadenhall Building is worried about potential risks in the project.  Your team is hired as a risk management consultant by the investor to review and audit the project.  Please prepare a report and presentation about risk items you see in the project.  Provide the project engineer, Karl Wilkinson, a risk management plan for each risk item that you identified.  Analyze the risk, develop responses, and explain how you would monitor and control the risk.  (Note: the identified risk item could be mentioned explicitly in the video, or you believe it exist even though the video did not mention it.)

Please watch carefully the two videos: “Super Skyscrapers – The Leadenhall Building, London 2014” and “Leadenhall-Arup” in Module 3.  Think about what can go wrong for each work item (think WBS and RBS) – that is your risk area.  Then think about how you would manage it.

Link:
https://www.youtube.com/watch?v=7ZL7rwPv6jY
https://www.youtube.com/watch?v=g5RgRboBE2Y&ab_channel=OctavianBrasoveanu

 -identify one risk area and offer at least one risk management solution.
– prepare 1 PowerPoint slide (as a summary report) on the risk and its management solutions.

THANK YOU SO MUCH AS ALWAYS

Preferred Format: APA

Number of Sources: 5

Number of Pages: 1

PowerPoint slides: 1

Preferred Spacing: Double spaced

Answer preview for the paper on ‘Assume one of the financial investors in the Leadenhall Building is worried about potential risks in the project’

Assume one of the financial investors in the Leadenhall Building is worried about potential risks in the project.

3 slides

Click the purchase button below to download full answer…….